BC Hydro has used Palisade’s risk analysis software @RISK for electricity load forecasting for many years; this use was expanded to the DSM program. @RISK was used to capture the level of uncertainty of the estimated savings for each individual DSM project. Around 60 projects were analysed on a case-by-case basis, and a probability distribution […]